2023 Road Rejuvenation

**Work Days are Weather Dependent and Subject to Change**

Projected Work Days and Streets

DOWNLOAD

Projected Work Days Map Only

DOWNLOAD

Day 1: March 20

Work Area (Red Line): Dune Oaks Dr, Ocean Green Dr, DeBordieu Blvd (Sea Island Dr. to Prospect Point Lp), Tabby Ln, Rosetter Ct, Prospect Point Lp

DOWNLOAD

Day 2: March 21

Work Area (Orange Line): Dune Oaks Dr, Ocean Green Dr, DeBordieu Blvd (Sea Island Dr. to Prospect Point Lp), Tabby Ln, Rosetter Ct, Prospect Point Lp

DOWNLOAD

Day 3: March 22

Work Area (Yellow Line): DeBordieu Blvd (Prospect Point Lp to Summer Haven Ct), Breakwater Ct, Sea Biscuit Ct, Pioneer Lp, Clipper Ct

DOWNLOAD

Day 4: March 23

Work Area (Green Line): DeBordieu Blvd (Prospect Point Lp to Summer Haven Ct), Seawind Ct, Pioneer Lp

DOWNLOAD

Day 5: March 24

Work Area (Blue Line): Ballyhoo St, Whiting Ln, Permit Ct, Wahoo Ln, Marsh Lake Dr, Luvan Blvd (End at Clubhouse to Wallace Pate Dr), DeBordieu Blvd (Summer Haven Ct to End), Ocean Park Lp, Leeward Ct, Tradewind Ct, Walking Trails (DeBordieu Blvd to Wallace Pate Dr)

DOWNLOAD

Day 6: March 25

Work Area (Purple Line): Ballyhoo St, Whiting Ln, Permit Ct, Wahoo Ln, Marsh Lake Dr, Luvan Blvd (End at Clubhouse to Wallace Pate Dr), DeBordieu Blvd (Summer Haven Ct to End), Ocean Park Loop

DOWNLOAD

Day 7: AMENDED Monday, April 3

Weather permitting, the second half of Bonnyneck Drive and Swan Point Trail will be treated next Monday, April 3, 2023 along with the other roads scheduled to be treated on that day.

DOWNLOAD

Day 7: March 27

Work Area (Yellow Line): Bonnyneck Dr, Swan Point Trail

DOWNLOAD

Day 8: March 28

Work Area (Pink Line): Collins Meadow Dr, Brandon Way, Shearwater Ct, Foxtail Place

DOWNLOAD

Day 9: March 29

Work Area (Yellow Line): Walking Trails (Wallace Pate Dr to End), Royal Tern Ct, Luvan Blvd (Wallace Pate Dr to Just Past Colony Pointe Dr)

DOWNLOAD

Day 10: March 30

Work Area (Green Line): Jutland Ln, Calais Ave, Sanderling Ave, Pinckney Rd, Lantana Cr (From Yaupon Rd to Aerie Ct), Bald Eagle Ct, Sweet Grass Ln, Aerie Ct

DOWNLOAD

Day 11: March 31

Work Area (Purple Line): Jutland Ln, Calais Ave, Sanderling Ave, Pinckney Rd, Lantana Cr (From Yaupon Rd to Aerie Ct), Bald Eagle Ct, Sweet Grass Ln, Aerie Ct

DOWNLOAD

Day 12: April 1

Work Area (Green Line): Lantana Cr (Aerie Ct to Yaupon Rd), Trotter Tr, Rice Planter Wy, Wood Stork Ln, Old Carriage Lp, Fennel Ct, Severin Pl, Wallace Pate Dr S, Colony Club Dr

DOWNLOAD

Day 13: April 3

Work Area (Teal Line): Lantana Cr (Aerie Ct to Yaupon Rd), Trotter Tr, Rice Planter Wy, Wood Stork Ln, Old Carriage Lp, Fennel Ct, Severin Pl, Wallace Pate Dr S, Colony Club Dr, Josie Wy

DOWNLOAD

Day 14: April 4

Work Area (Blue Line): DeBordieu Colony (Luvan Blvd) Main Entrance to Gatehouse and DCCA Administration Parking Area

DOWNLOAD